The DuBois First Day Cottage

Monday, May 25, 2015

2015-05-25 First Floor Decking






Posted by Skippy at 1:53 AM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Newer Post Older Post Home

Blog Archive

  • ►  2017 (1)
    • ►  August (1)
  • ►  2016 (4)
    • ►  January (4)
  • ▼  2015 (148)
    • ►  December (13)
    • ►  November (9)
    • ►  October (15)
    • ►  September (15)
    • ►  August (12)
    • ►  July (16)
    • ►  June (18)
    • ▼  May (22)
      • 2015-05-31 Decking, Electrical Trench, Garage Soff...
      • 2015-05-30 First Floor Decking, Walls Beams, Elect...
      • 2015-05-28 Back Fill Complete
      • 2015-05-25 First Floor Decking
      • 2015-05-24 Beams and Posts
      • 2015-05-23 Framing of First Floor
      • 2015-05-22 Electrical and Framing
      • 2015-05-21 Electrical and Kit Delivery
      • 2015-05-20 Foundation
      • 2015-05-19 Insulated Foundation
      • 2015-05-18 Tar and Electrical
      • 2015-05-17 Slab and Radiant Floor, and Well work
      • 2015-05-16 Sill Plate and Floor Joists
      • 2015-05-13 Well and Electric Trench
      • 2015-05-10 Garage Roof and a Poured Foundation
      • 2015-05-09 Finished Garage and Foundation
      • 2015-05-08 Foundation
      • 2015-05-07 Footings Backfilled
      • 2015-05-06 Poured Footings
      • 2015-05-04 House Footings and Garage Siding
      • 2015-05-03 Garage Siding
      • 2015-05-02 Foundation excavation
    • ►  April (15)
    • ►  March (10)
    • ►  January (3)
  • ►  2014 (44)
    • ►  December (15)
    • ►  November (11)
    • ►  October (7)
    • ►  August (3)
    • ►  July (5)
    • ►  June (2)
    • ►  March (1)

Pages

  • Home
  • About us
  • The House Plan
  • First Day Cottage

Contributors

  • Jill
  • Skippy

Our Home

Our Home
Here is the Picture of what we are Building
Watermark theme. Powered by Blogger.